Atlantic Boulevard

Interested? Reserve a Unit

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Atlantic Boulevard Estate (ATL) is a Middle-income residential estate on the Lekki-Epe expressway. Located about five minutes’ drive from Ajah Roundabout and behind the Pan Atlantic University (Lagos Business School), the development offers exceptional value embodied in its design which is guided by the exigency to develop modern, aesthetically pleasing and functional spaces that capture the essence and spirit of family living.

It is designed to meet the needs of the clients by the simple virtue of it providing shelter and a truly luxurious space surrounded by state-of-the-art amenities so residents will have little or no reason to leave the comfort of the estate.

Now selling from 33,374,000. The Estate Offers flexible payment structure which enables subscribers pay within the period of 6 months. Atlantic Boulevard offers 85 units of 2- and 3- bedroom apartments, 4-bedroom terrace house, and 4-bedroom maisonettes.

Flexible payment structures and Mortgage options Available!!!

No items found.

Project Progress

01

July 2020

Building right-wing columns ready for casting.

02

July 2020

Columns’ Alignment checking.

03

July 2020

Columns’ casting is ongoing View of the top from the columns

04

July 2020

Casting and vibration ongoing.

05

July 2020

View of the building's right wing.

06

July 2020

View of the building's left wing.

07

July 2020

Lift walls’ reinforcement & Formworks works are ongoing.

08

July 2020

Concrete casting & vibration are ongoing.

23

November 2020

Ongoing work on site.

24

November 2020

Ongoing work on site.

24

November 2020

Ongoing work on site.

24

November 2020

Ongoing work on site.

24

November 2020

Ongoing work on site.

25

November 2020

Ongoing work on site.

25

November 2020

Ongoing work on site.

25

November 2020

Ongoing work on site.

26

November 2020

Ongoing work on site.

26

November 2020

Ongoing work on site.

27

November 2020

Ongoing work on site.

27

November 2020

Ongoing work on site.

Site Preparation Activities: Sand filling, spreading in progress.

Compacting and wetting of imported soil to improve strength using a 30 ton smooth wheel roller.

Soil Test Work: Dutch cone penetrometer test in progress.

Geotechnical test guarantying adequate soil test.

Ongoing work on site: Excavation for block works

Casting of 3rd floor slab

Progress update, June 2022

progress report November 2022